Project planning is where a broadcast build is won or lost. Before any equipment is ordered or any cable is pulled, the scope has to be agreed, the budget tested against it, and the programme fixed around the dates that cannot move: a channel launch, a lease end, the start of a season. Intraframe's planning service gives broadcasters, streaming services and corporate media teams a clear, costed route from an outline brief to a build that can be scheduled and resourced.

Broadcast facilities rarely start from a clean sheet. A new gallery may have to be built while the existing one stays on air, a move between sites may need an interim operation, and a single project can involve architects, building contractors, furniture makers, equipment vendors and the client's own engineers. Planning sets out who does what, in which order, and where the dependencies and risks sit, so that problems surface on paper rather than on site.

Engineers lead the planning, not administrators, so schedules reflect how broadcast systems are actually built: procurement lead times, rack pre-fabrication off site, technical power and cooling readiness, testing windows, and operator training before go-live. Since 1989 Intraframe has delivered facility builds, relocations and interim operations for broadcasters and media organisations, and that experience shapes how each programme is put together.

How we deliver it

Our process

  1. Brief and requirements

    Operational and engineering stakeholders are interviewed to establish what the facility must do, the formats and standards involved, and the fixed dates the project has to meet.

  2. Site survey

    A survey of the building or existing facility records space, power, cooling, cable routes and access, and identifies which equipment and infrastructure can be reused.

  3. Feasibility and budget

    Options are costed and compared, producing a budget forecast with its assumptions stated so it can go to a board or finance team for approval.

  4. Programme and critical path

    A milestone schedule covers design, procurement, pre-fabrication, installation, testing and training, with the critical path and long-lead items identified.

  5. Risk and phasing

    Technical, commercial and on-air risks are logged with owners and mitigations, and the works are phased so that live services are protected during the build.

  6. Vendor and procurement roadmap

    Suppliers, contractors and order dates are lined up against the programme so that equipment arrives when the build needs it, not before and not after.

What you get

Key deliverables

  • Feasibility studies and budget forecasting
  • Milestone and critical-path scheduling
  • Risk analysis and mitigation planning
  • Vendor coordination and procurement roadmaps
  • Requirements and scope document agreed with stakeholders
  • Site survey report covering space, power, cooling and cable routes
  • Phasing plans for works in facilities that must stay on air
  • Relocation and interim-operation plans for moves between sites
  • Health and safety and CDM inputs for the construction phase
  • Progress reporting against the programme through to handover
Questions

Project Planning: FAQ

How early should we involve Intraframe?
Ideally before the budget is fixed or the space is committed. Decisions about room layout, technical power, cooling and cable routes are cheap to change on a drawing and expensive to change once building works have started. An early survey also shows which existing equipment and infrastructure can be reused.
Can you plan a move between sites while we keep broadcasting?
Yes. For Al Araby TV, Intraframe modified a studio and gallery inside IMG's Stockley Park facility, supported that interim operation for more than two years, then built the permanent facility at Park Royal and managed the transition. Planning for any move starts from the services that must stay live and works back from there.
What do we have at the end of the planning stage?
A documented scope, a site survey, a budget forecast with its assumptions, a milestone schedule showing the critical path, a risk register and a procurement roadmap. Together they give you enough to approve the project and move into detailed system design.