System Integration
Broadcast systems integration: rack pre-fabrication, loom wiring, fibre and SMPTE termination, technical furniture, testing and sign-off.
System integration is the physical build: installing, wiring, terminating, testing and commissioning a broadcast system so that it works as designed on the day it goes live. Intraframe's field engineers build galleries, studios, MCRs, equipment rooms, headends and outside broadcast vehicles, and integrate new equipment with the infrastructure already in a building. The work follows the design documentation, which is kept in step with what is actually installed.
Much of the build happens before anyone arrives on site. Racks are pre-fabricated and loom-wired off site where possible, so time on site is spent installing and connecting rather than dressing cable in a working building. That matters when a facility has a fixed launch date, when other trades are working in the same rooms, or when the build is inside an OB truck where space and access are tight.
Testing is part of integration rather than an afterthought. Circuits are tested and labelled against the cable schedule, equipment is asset-tagged and PAT tested, and the system goes through acceptance with the client's engineers before handover. Intraframe stays on site through testing, acceptance and handover, and trains operators and engineers on each area of the system.
Our process
Pre-fabrication and FAT
Racks are built and loom-wired off site to the rack elevations and cable schedules, then checked in factory acceptance testing before they ship.
Site installation
Technical furniture is assembled, racks positioned, and technical power, network and containment installed, coordinated with other trades under the site CDM and health and safety arrangements.
Wiring and termination
Copper, fibre and SMPTE camera cables are run, terminated and labelled to the cable schedule, including tie-lines between technical areas.
Configuration and commissioning
Equipment is configured and integrated with existing systems, and signal paths, intercom, tally and control are checked from source to destination.
Site acceptance testing
The installed system is tested against the design with your engineers, and any snags are logged and closed before sign-off.
Handover and training
Handover brings together as-built drawings, the asset register and test records, alongside training for operators and engineers on each system area.
Key deliverables
- Rack pre-fabrication and precision loom wiring
- Fibre optic and SMPTE connector termination
- Console and height-adjustable technical furniture build
- Acceptance testing and sign-off
- Technical power installation and certification
- Network and AV infrastructure prefabrication, installation and certification
- Equipment inventory, asset tagging and PAT testing
- Site CDM and health and safety management
- Integration of new systems with existing infrastructure
- Operator and engineer training at handover
Related projects
System Integration: FAQ
Can you work in a facility that is still broadcasting?
Do you only install systems you have designed?
What do we receive at handover?